Nobody can honestly give a single timescale for building in Benidorm, because the town contains such different situations. A new house on an outer plot, a flat joined to its neighbour and an old town house with thick walls are all different jobs. What we can do is explain the stages, and where the time tends to go.

The stages, in order

  1. Survey. We walk the plot or visit the building, measure up and look at the structure.
  2. Design and drawings. For a new house we work with a technical architect from the start, so drawings, licence and construction follow one plan.
  3. Permission. The town hall decides what permission a property needs. In a block, the community of owners may also need to agree.
  4. Preparation. Materials are ordered and the trades are programmed.
  5. Construction. Groundwork or strip-out, structure, services, plastering, tiling and fitting, then painting.
  6. Handover. We walk through the finished work with you.

The part before anyone lifts a tool

This is the stage most owners underestimate. It depends on other people: the architect, the town hall and, for a flat, the community. We cannot promise how long a decision will take, but we can tell you at survey whether a licence is likely to be needed and what to expect. If the community is unlikely to consent to a change, it is far better to know that before drawings are paid for.

We also ask for the community statutes where a flat is involved, because they can set working hours and rules on lift use that the programme must respect from the first day.

Why the site changes the schedule

On the edges of Benidorm and in the surrounding urbanisations, plots often slope. A sloping site can mean retaining walls, terraces and garages cut into the ground, which add steps to the early part of the build. In a tower block the constraint is different: everything arrives and leaves through a lift or stairwell, so materials are brought in small loads and waste is cleared regularly. A programme that ignores this will slip.

What happens on site

Once work starts, trades follow each other in a set order, and a good programme avoids two of them needing the same room at once. Plumbing and electrics go in before the walls are closed, plastering must be dry before tiles and fittings go on, and painting is last. Some things cannot be hurried, such as waterproofing that needs time to cure before tiling.

What stretches a project

Keeping track from abroad

Many owners here are away for much of the year. One person manages the trades, and you receive photographs and phone updates, with decisions agreed in writing. If you are weighing a bigger scheme, our extensions and new builds page explains how we assess each plot.

The programme moves fastest when choices are made before the trade needs them, so we flag each decision with plenty of notice and explain what waiting would hold up. Tiles, units and fittings that must be ordered are the usual culprits, and a late change of mind on one of them can leave a team waiting.

Ready to get a free quote for your Benidorm renovation project?

Visit Dragon Reforms →

Why Choose Dragon Reforms

Local team based on the Costa Blanca
Fully insured, quality workmanship
Free, no-obligation quotes
Clear pricing before any work starts

We're a local team covering Benidorm and towns right across the Costa Blanca, with every project backed by clear pricing and fully insured, quality workmanship from start to finish.

Property Renovations Across the Costa Blanca

Dragon Reforms provides property renovation advice for homeowners throughout Benidorm, Altea, Callosa d'en Sarrià, La Nucía and Finestrat and towns right across the Costa Blanca.