Nobody can honestly give a date for a villa in Altea before seeing the plot, and we will not pretend otherwise. What we can do is walk through the stages, show where the time goes on a hillside, and explain what you can control.

Stage one: everything before the first spade

A project architect prepares the drawings and handles the licence process alongside us. The town hall decides on the licence, so this stage depends on the design and the authority, not on the builder. We also settle the practical questions: how a lorry reaches the site, whether a concrete pump can get close and where the spoil goes. We will not promise a finished date until the licence, the ground and the access are understood.

Stage two: groundworks and foundations

On a slope this is rarely quick. Excavation, retaining walls and foundations that follow the fall of the land come first, together with drainage behind and around the new walls. Heavy rain during this stage can interrupt work, and it is the stage where the ground sometimes tells you something unexpected.

Stage three: structure and roof

Once the walls and floors are up and the roof is on, the house is weatherproof. Steep access means materials arrive in smaller loads or by other methods, which stretches this stage compared with a flat site.

Stage four: services

Plumbing, electrics, and air conditioning go in before the walls are finished. Doing this properly while everything is open is much better than cutting in later.

Stage five: finishes and outside

Plastering, tiling, joinery, kitchens and bathrooms, then terraces, paving and pergolas. Tile and made-to-order items should be chosen early so nothing holds up the trades.

Why a hillside plot is different from a flat one

On level ground a building site can be laid out around the house. On a steep plot in the hills, every stage depends on getting machines and materials to the right level. A concrete pump that cannot get close, a lorry that cannot turn on a narrow road, and spoil with nowhere to go all slow the work, and they cannot be fixed by adding more people. This is why we walk the site, the track and the neighbours' boundaries before we say anything about time.

What stretches a hillside programme

What keeps it moving

A settled design and specification, and one team running the trades in the right order. We build the foundations, structure and roof, and manage the trades that follow, so there is a single point of accountability. If you live abroad you receive photographs and calls rather than having to visit. We agree a programme with you at the start and tell you promptly if anything alters it. The quotation is free and the work is guaranteed within the scope set out in the quotation.

For a project of a different kind, such as converting the lower floor of an existing villa, read about our extensions and new builds work. Ask any builder what the programme assumes about access, because that is where hillside estimates most often go wrong.

Ready to get a free quote for your Altea renovation project?

Visit Dragon Reforms →

Why Choose Dragon Reforms

Local team based on the Costa Blanca
Fully insured, quality workmanship
Free, no-obligation quotes
Clear pricing before any work starts

We're a local team covering Altea and towns right across the Costa Blanca, with every project backed by clear pricing and fully insured, quality workmanship from start to finish.

Property Renovations Across the Costa Blanca

Dragon Reforms provides property renovation advice for homeowners throughout Altea, Callosa d'en Sarrià, La Nucía, Finestrat and Villajoyosa and towns right across the Costa Blanca.