A new villa in this area begins long before the first wall goes up. The plot comes first, and on the hills above Albir and around Alfaz del Pi plots vary a great deal: some are larger and more private, but harder to reach, and almost all of them slope.

Why the plot matters most

Access for lorries and concrete pumps is one of the first things we check, because it affects how a build is organised. The slope affects groundworks, retaining walls and drainage. The route that water, power and drainage will take to the house affects both cost and disruption. A site that looks ideal in a viewing can turn out to be an expensive one for these reasons.

If you are weighing a plot, we are happy to visit before you buy. We cannot confirm planning rules, but we can explain what ground, slope and access mean for a build.

The stages of a build

  1. Survey and brief. We look at the plot and discuss how you plan to use the house.
  2. Drawings. A technical architect prepares them, and our planning runs alongside.
  3. Licence. The town hall decides what permission is required and whether it is granted.
  4. Groundworks and structure. Excavation, foundations, retaining walls and the frame.
  5. Services and finishing. Plumbing, electrics, plastering, tiling, carpentry, windows and painting, called in one after another.

What drives the cost

Size is the obvious factor, but the shape of the house, the number of levels, the foundations the slope demands and the quality of the finishes all carry weight. Outdoor areas count as well. Terraces, steps, a pergola and any pool surround are part of how the house is used, so they belong in the budget from the beginning. We do not build pools.

Approvals and what we will not promise

We do not state planning rules, because the town hall decides them case by case. We tell you at survey what looks likely and what remains uncertain, and the quotation marks which items depend on approvals. If you are thinking of letting a part of the property, that is a legal question for the authorities, and we build to the permitted use.

Plan the whole property, not only the house. Boundary walls, steps and terraces on a hillside plot are structural work in their own right, and walls that retain soil have to be built correctly. Doing them in the same programme as the house avoids a second round of machinery and disturbance later.

Fitting in with the area

Alfaz del Pi has an older village heart, and Albir spreads along the shore with apartments and villas on the slopes behind. A new house sits better when its scale, render and roof line respect the neighbouring ones, and stone steps and boundary walls can be built to match nearby work.

Services deserve early attention. Water, power and drainage have to reach the house, and on a large hillside plot the route can be long. We trace it at the survey so it appears in the quotation rather than as a surprise during groundworks.

We would rather give you an honest view of what suits the property than sell you extras, and the first visit is where that conversation starts.

We coordinate every trade ourselves and speak English and Spanish, with photographs for owners overseas. The quotation is free, and the work is guaranteed within the scope set out in the quotation.

Ready to get a free quote for your Alfaz del Pi / Albir renovation project?

Visit Dragon Reforms →

Why Choose Dragon Reforms

Local team based on the Costa Blanca
Fully insured, quality workmanship
Free, no-obligation quotes
Clear pricing before any work starts

We're a local team covering Alfaz del Pi / Albir and towns right across the Costa Blanca, with every project backed by clear pricing and fully insured, quality workmanship from start to finish.

Property Renovations Across the Costa Blanca

Dragon Reforms provides property renovation advice for homeowners throughout Alfaz del Pi / Albir, Polop, Benidorm, Altea and Callosa d'en Sarrià and towns right across the Costa Blanca.